#03.0 Alfresco - LIRR Structures -Substations | EAM-4313 |
#04.0 Alfresco - LIRR Structures -Track Design & Interlocking Projects | EAM-4314 |
#05.0 Alfresco - LIRR Structures - Misc Design and Inspections | EAM-4315 |
#06.0 Alfresco - LIRR Structures - Sidings, Team Tracks & Yards | EAM-4317 |
#07.0 Alfresco - LIRR Structures - Contracts | EAM-4850 |
#08.0 Alfresco - LIRR Structures - 3rd Party Contracting | EAM-3923 |
#09.0 Alfresco - LIRR Structures - Valuation Maps | EAM-3921 |
#10.0 Alfresco - LIRR Structures - Reference Material and Documentation | EAM-1083 |
#11.0 Alfresco - LIRR Structures - STANDARDS | EAM-298 |
#12.0 Alfresco - LIRR Structures - Emergency Bridge Hit Inspection Schedules | EAM-4685 |
#13.0 Alfresco - LIRR Structures - Signal Towers | EAM-3962 |
#14.0 Alfresco - LIRR Structures - High Tension Tower Inspection Reports | EAM-4080 |
#15.0 Alfresco - LIRR Structures - Retaining Wall | EAM-4316 |
AED OPERATOR’S CHECKLIST- HXGN EAM IMPLEMENTATION RITM0861783/SCTASK1395642 | EAM-4952 |
APP-0838 Infor Enterprise Asset Management 11i - MTA Bus | EAM-4809 |
APP-1039 Spear-Rolling Stock Maintenance Information System | EAM-4806 |
APP-2038 Enterprise Geospatial Information System - Enterprise Assets Management | EAM-4811 |
Add LOV Table to DOB Spear 4i to support SO Mobile - TA_C_INSP_SO_PICKUP | EAM-5818 |
Add TA_C_MOBILE_USERMAP table to DOB Spear 4i LOV Tables | EAM-5819 |
Additional Alfresco licenses Needed | EAM-5281 |
Alfresco Search Screen for LIRR MofE Kiosk Users | EAM-5276 |
ArcGIS SURVEY 123 HPO Count Subway Update | EAM-3638 |
As per the DBA server oracle version need to be upgraded from 12C to 19C | EAM-3579 |
B&T#3: Work Force Qualifications interface | EAM-427 |
BAS Interface between DOS/EAM and iTrac Train Consist | EAM-4778 |
Build a connector (gateway) for Microsoft Power BI (32 bit ver.) to access SPEAR/RSMIS (32 bit ver.) | EAM-3632 |
Cleanup bad PTC Work Orders in MNR/EAM | EAM-5775 |
Comms- Load assets and hierarchy. | EAM-3821 |
Convert APIs from XML to JSON (RITM0721791/SCTASK1294212) | EAM-1019 |
Create Document Approval Workflow for MNR MofE | EAM-4477 |
Create Document Approval Workflow for MNR MofE | EAM-4278 |
Create Reconciliation Process with Cubic for OMNY Children Equipment Records in both Spear/DOB and Spear/AFCRail | EAM-4117 |
Create Reusable IJ Asset Data Load process for MNR to routinely use in QA and PRD to create new Insulated Joint Asset records | EAM-4640 |
Data Integrations related to AFC migration to DOS Infor EAM | EAM-3577 |
Decommission of Maximo CAMS-I | EAM-2566 |
EAM IDEA0003037 Add new WILD sites to the http://asp.mnr.org/M7Faults/Wild.aspx report | EAM-45 |
EAM Integrator v4.2 for LIRR | EAM-3428 |
ENG Systems Operations (Power Directors) - Clearance & Protection Records | EAM-1037 |
Enhance Child Equipment Data Load Spreadsheet Process for CVM Children with different Parent-Child Positions | EAM-3310 |
Enhance SO Mobile to Include Non-Revenue Vehicles | EAM-4018 |
Enhance the Fire Extinguisher (FE) Completion report (Cognos) for additional locations | EAM-1655 |
Enhance the OMNY NYCT Child Equipment Reconciliation to include DOS/EAM | EAM-3570 |
Enhancement to Alfresco | EAM-5832 |
Flow Diagram | EAM-3344 |
IT Support to migrate data/functionality from the DRAW system into Subways Infor EAM and decommission parts of the DRAW system | EAM-3631 |
Implement Digital Track Walk Inspections Developed by Accenture | EAM-1039 |
Implement MNR Signals Inspection 1 of 8 for Inspection Types 10A/B, 11 (Hexagon Build) | EAM-5613 |
Implement Track Daily Inspections (Hexagon Built) | EAM-3819 |
Infor 11i Platform Migration | EAM-600 |
Integation between Genesys - call center platform with HxGN EAM | EAM-70 |
LIRR Fleet Inspection Process in EAM with Transit Mobile and integrated with Maximo | EAM-4725 |
MNR Car Loads - New M8 Units | EAM-1897 |
MNR implementation shadowing | EAM-1957 |
Migrate Esri GIS on prem environment to Azure cloud | EAM-3633 |
New Integration between EAM and iTrac/RSMIS for SM Inspection Schedule and Consist data. | EAM-4901 |
POC using Sharepoint Cloud as a Repository for documents uploaded and viewed via DOS/EAM | EAM-5510 |
PRJ0010022 Create a Data Integration tool for LIRR EAM, MNR EAM with Bentley and ESRI for Assets, Work Requests and Work Orders | EAM-472 |
PRJ0060409 Migrate PTC Maximo Systems from Alstom Vendor to On Prem for LIRR and MNR | EAM-419 |
PTC | EAM-3823 |
Power-Load assets and hierarchy | EAM-3822 |
RHEL Fuse 7.x EOL | Preserve 7.x PROD Libraries | EAM-5362 |
Retire IRIS/Spear (Data Analytics of 3 visual Track Inspections with data from legacy systems and current DOS/EAM) | EAM-5 |
SADM-APP-0587: Spear-AFCRail- Assessment & Recommendation (Superdome Migration) | EAM-5372 |
Security Materials/Inventory Management Cameras/Servers/NVRs (RITM0845148/SCTASK1386306) | EAM-4956 |
Send attachments on LIRR/EAM Auto-Emailed Reports to a "Completed Signal Inspections" Folder in Alfresco | EAM-3693 |
Set up Alfresco Production Environment for MNR MofE Operations Training Department | EAM-4327 |
Supply Chain Integration | EAM-2211 |
Task 11 Release 1.2 Implementation | EAM-59 |
Upgrade/Migrate UCAID Database from the Superdome (APP-1159) | EAM-5193 |
Work Force Qualifications interface | EAM-60 |
need to integrate the chargers into the Depot control log and allow them to show OOS in the non revenue equipment OOS section stating charger capability | EAM-3082 |